「快速门安装」高效安全安装厂房堆积门

作者:沈阳快速门安装   发布时间: 2019/7/20 11:26:48

 

「快速门安装」高效安全安装厂房堆积门


"Fast Door Installation" Efficient and Safe Installation of Storage Doors in Factory Buildings



在使用快速门的车间,有时候会遇到比较特殊的情况,就是门洞尺寸特别大,超出了常规的尺寸,这个时候普通的快速门是无法满足其受力抗风的要求


In workshops using express doors, there are sometimes special situations, that is, the size of the door is too large to exceed the conventional size. At this time, the ordinary express doors can not meet the requirements of wind resistance.

 

沈阳厂房快速堆积门




所以当工业厂房的洞口面积过太大,同时又对于门体的运行速度要求比较快的时候,此时最佳选择就是工业快速堆积门解决方案。


Therefore, when the opening area of industrial plant is too large and the speed of the door body is required relatively fast, the best choice at this time is the industrial fast stacking door solution.


工业快速堆积门利用背带将门帘以层层堆积的方式折叠起来,保证了抗风性能很好的同时也保证了开启速度不逊色于快速门。


ndustrial fast stacking doors fold up the curtain layer by layer by layer with a strap, which guarantees good wind resistance and also ensures that the opening speed is not inferior to that of fast stacking doors.


「快速门安装」高效安全安装厂房堆积门



"Fast Door Installation" Efficient and Safe Installation of Storage Doors in Factory Buildings



下面就说下安装快速堆积门的安装步骤教程:


The following is a tutorial on installation steps for installing fast stacking doors:

 

本溪感应快速门




一、堆积门安装位置弹墨线定位


I. Location of Ink Line in the Installation Position of Stacking Door


根据设计师出的图纸说明的尺求、位置标出堆积门的标高和方向,画出门框框口及方位线位置。

According to the designer's drawing instructions, the elevation and direction of the stacking door are marked, and the position of the door frame and azimuth line are drawn.


二、堆积门门框灌浆


2. Grouting of stacked doorframes


快速堆积门的门框内需要填充1:3水泥砂浆,不过在填充之前,需要先将门关好,在门扇敞开面的门框与门扇之间的防漏孔处塞上塑料盖后再进行填充。


A 1:3 cement mortar should be filled in the door frame of the quick stacking door, but before filling, the door should be closed, and the plastic cover should be plugged in the leak-proof hole between the door frame and the door fan on the open surface of the door before filling.

 

阜新感应快速卷帘门




填充水泥时,注意填充的量,不宜过多,以免造成门框变形,继而影响使用。


When filling cement, pay attention to the amount of filling, not too much, so as not to cause door frame deformation, and then affect the use.


三、现场人员复核堆积门的门洞


3. On-site personnel review the doors and holes of stacking doors


安装门体前检查快速堆积门将要安装的尺寸、位置,看洞口是否平整,有无偏位或不方正情况出现,有的话及时进行剔凿或抹灰处理,确保洞口符合快速堆积门的安装要求。


Inspect the size and position of the quick stacking door before installing the door body to see whether the opening is flat, whether there is offset or irregularity, and if so, pick or plaster it in time to ensure that the opening meets the installation requirements of the quick stacking door.


四、固定门框


IV. Fixed Door Frame


快速堆积门门框的固定需要利用1.5mm厚镀锌衔接件来进行,固定衔接件与墙体时,最好选用膨胀螺栓。


Fast stacking door frame fixing needs to use 1.5mm thick galvanized joints, when fixing joints and walls, it is best to choose expansion bolts.


此外,快速堆积门门框与门洞墙体之间要预留一定的装置空间,胀栓固定预留20-30mm,同时门框每边的衔接点要在3个以上。


In addition, a certain device space should be reserved between the quick stacking doorframe and the wall of the doorway, and 20-30 mm should be reserved for the expansion bolt fixation. At the same time, the connection points of each side of the doorframe should be more than three.


五、门框就位

V. Door frame in place


拆掉堆积门门框下部的固定板,将门框用木楔暂时固定在洞口内,经校对合格后,固定木楔。


Remove the fixing plate at the lower part of the stacked door frame and temporarily fix the door frame with a wooden wedge in the hole. After checking, fix the wooden wedge.


门框埋入±0.00m标高以下20mm,须确保框口上下尺度一样,答应差错<1.5mm,对角线答应差错<2mm。


When the door frame is embedded below (+0.00m) elevation of 20mm, it must be ensured that the upper and lower dimensions of the frame mouth are the same, and the error is promised to be less than 1.5mm and the diagonal error is less than 2mm.


六、空隙处理


VI. Void Treatment


快速堆积门的门框与墙体之间有缝隙,该缝隙适合于用1:2水泥砂浆进行嵌缝结实。


There is a gap between the door frame and the wall of the quick stacking door. The gap is suitable for using 1:2 cement mortar for joint consolidation.


处理缝隙时,应确保与墙体结成全体,经维护凝结后,在粉刷洞口及墙体,必要时门框与墙体衔接处打修建密封胶,以保证快速堆积门的密封性


When dealing with crevices, we should ensure that all the crevices are bound with the wall. After maintenance and condensation, we should build sealant at the entrance and wall of the painted hole and at the junction of the door frame and the wall when necessary to ensure the sealability of the quick accumulation door.

 

相关新闻:

快速门控制系统--堆积门变频控制器 24-03-04
厂房堆积门安装维修-年末找人难 24-02-01
沈阳本土堆积门厂家定做安装维修厂房防寒快速门 24-01-27
定做厂房快速门专用安装团队服务 24-01-10
版权所有:沈阳龙盛快速门制造有限公司联系我们:13940183063全国热线:4006080090
公司地址:沈阳于洪区黄海路29号座机:024-31081023百度地图 - 网站地图 -